On November 6, the receipt of the works to replace the artificial grass of the El Pinar football field in Zizur Mayor (Navarra) was signed, the field has more than 7.500 sqm.

The works lasted 4 weeks and consisted of the extraction of the old artificial grass, for the installation of an artificial grass without rubber filling on a prefabricated elastic base.

The system meets the requirements of the FIFA QUALITY Standard of the FIFA Handbook of Test Requirements in all tests performed.