On September 10, the contract for the substitution of artificial grass took place after correction of slopes with asphalt agglomerate in the Urbieta I (Hego Zelaia) soccer field in Gernika-Lumo, of 6,700 m2.

The works will begin shortly. And the estimated duration will be 2 months.

The grass to be installed will consist of a new system without SBR rubber and with a prefabricated elastic base.