FEATURED PROJECTS

Replacement of the artificial grass on the El Pinar field, in Zizur Mayor (Navarra)

On November 6, the renovation work of the El Pinar football field was handed over in Zizur Mayor (Navarra).

The works lasted 4 weeks and consisted of the extraction of the old artificial grass (7,500 m2), for the installation of a 40 mm artificial grass without rubber infill on a prefabricated elastic base.

The system, only filled with sand, meets the requirements of the FIFA QUALITY Standard of the FIFA Handbook of Test Requirements in all the tests carried out.