FEATURED PROJECTS

Artificial grass installation works on two tracks of the Pedralbes School (Barcelona)

This August, the artificial grass installation works were carried out on two of the tracks of the Pedralbes School, which were made of concrete. In addition, all the sports equipment, 7-a-side football goals and futsal goals have been renovated, as well as the fence to stop the balls nets that separate both tracks.

A total of 1,600 m2 of artificial turf weighted with flint sand have been installed.