This August, the artificial grass installation works were carried out on two of the tracks of the Pedralbes School, which were made of concrete. In addition, all the sports equipment, 7-a-side football goals and futsal goals have been renovated, as well as the fence to stop the balls nets that separate both tracks.
A total of 1,600 m2 of artificial turf weighted with flint sand have been installed.